My plans0Newsletter

Mission Boulevard sidewalk work begins

Fayetteville · Posted Aug 14

Fayetteville says construction on a 220-foot sidewalk gap along the north side of Mission Boulevard will begin Monday, Aug. 17. The work is between Libby Lane and Winwood Drive and is scheduled through Oct. 1.

The westbound lane will close periodically from 9 a.m. to 2:30 p.m. Both lanes will remain open during school drop-off and pickup times. The photo is representative, not the Fayetteville project site.

See something wrong?

NewsRepresentative photo, not the Fayetteville site, showing a neighborhood sidewalk construction zone with broken concrete, excavated soil, orange cones and a sidewalk-closed sign, under the headline Mission Boulevard sidewalk work begins.
Photo: Daderot / Wikimedia Commons (CC0)Original post

More news

Find out what’s next.

New openings, things to do and what’s changing across Northwest Arkansas, straight to your inbox.

Spotted something new?

Send it our way with the form, or email us at hello@nwanext.com. A lot of our best stories start with a reader.

Send us a tip

What is it?

Rather email? hello@nwanext.com